Migration Engine
Change your infrastructure layout with zero downtime.
The migration-engine plans and executes topology migrations as a green-blue cutover: provision the new layout, replicate state, shift traffic, then drain the old. Plan it, apply it, pause, resume or roll back at any point.
Technical docsHow it works
- 01 Submit the target topology; the engine returns a deterministic migration action list.
- 02 It provisions the green layout alongside the live blue one.
- 03 State is replicated and health-gated before any traffic moves.
- 04 Traffic cuts over, the blue layout drains, and you can roll back until the final commit.
Technical docs
Technical docs Go deeper
Full technical reference — setup, schema and worked examples.