Migration Engine

Change your infrastructure layout with zero downtime.

The migration-engine plans and executes topology migrations as a green-blue cutover: provision the new layout, replicate state, shift traffic, then drain the old. Plan it, apply it, pause, resume or roll back at any point.

Technical docs

How it works

  1. 01 Submit the target topology; the engine returns a deterministic migration action list.
  2. 02 It provisions the green layout alongside the live blue one.
  3. 03 State is replicated and health-gated before any traffic moves.
  4. 04 Traffic cuts over, the blue layout drains, and you can roll back until the final commit.
Technical docs

Go deeper

Full technical reference — setup, schema and worked examples.

Technical docs